INFRASTRUCTURE ON-GOING PROJECTS

Qatar Economic Zone One - QEZ-1

Scope of work:

  • Trench Excavation, Foul Sewer Pipeline Construction, Bedding, Backfill.

  • Manhole Excavation, Precast Installation, Network Connection and Backfill.

Client: Manateq.

Main Contractor: UCC - Sacyr.

Location: New Airport Road

The project duration: 120 days.

Roads and Infrastructure in Industrial Area (Road 33 to Road 52)

Scope of work:

  • Trench Excavation, Foul Sewer Pipeline Construction, Bedding, Backfill.

  • Manhole Excavation, Precast Installation, Network Connection and Backfill.

Client: JIS.

Main Contractor: GCC.

Location: Industrial Area

The project duration: 340 days.