INFRASTRUCTURE ON-GOING PROJECTS
Qatar Economic Zone One - QEZ-1
Scope of work:
-
Trench Excavation, Foul Sewer Pipeline Construction, Bedding, Backfill.
-
Manhole Excavation, Precast Installation, Network Connection and Backfill.
Client: Manateq.
Main Contractor: UCC - Sacyr.
Location: New Airport Road
The project duration: 120 days.
Roads and Infrastructure in Industrial Area (Road 33 to Road 52)
Scope of work:
-
Trench Excavation, Foul Sewer Pipeline Construction, Bedding, Backfill.
-
Manhole Excavation, Precast Installation, Network Connection and Backfill.
Client: JIS.
Main Contractor: GCC.
Location: Industrial Area
The project duration: 340 days.